CASE STUDIES
BUPA Dental Bolton
This project for BUPA Dental Care in Bolton was a relatively straight forward and small project however the level of service provided by the site team and the office team has resulted in Falcon Felt Roofing being awarded the preferred contractor status for all roofing projects at BUPA in all of Lancashire. We hold this position exclusively and are very proud of our appointment.
The Anvil Bolton
This project was particularly challenging. The existing deck on one of the roof areas had collapsed internally and as such required a full replacement with some joist replacement also. Elsewhere the site had a full reroof with Garland Stressply Flex Plus. The project was completed quicker than expected and both the manufacturer and the client were happy with our work. This project was issued with a 25 year guarantee by Garland upon completion.
Ysgol Bryngwyn School
This project was a conversion from metal to torch on felt membranes. This project was particularly challenging as the team were required to work using harnesses which impeded easy movement. The project for Alumasc finished on time and in budget and the finished product looks great!
Cant Clough Resevoir
This was our first United Utilities project installing a new Garland Stressply system to two valve houses in Burnley. The project was a fantastic success and with some complex curved welted drip detail completed to a high standard the client were very impressed with our work. This project has lead to additional project opportunities for Falcon Felt Roofing and we are looking forward to adding more U/U projects to our case studies soon.
Ashworth Hospital Phase 1
This re-roofing project for BMI Icopal has been a brilliant success! Both the manufacturer and the client have repeatedly sang our praises with one technical manager from Icopal saying "Falcon are the best contractor we have working for us right now!". This has been echoed by our client stating our quality goes beyond workmanship and includes our management, our systems and our dedication to support pre, during and post contract. We are looking forward to being involved in phase 2!